Serving Katy, Houston & surrounding areas • Licensed & Insured • 20+ Years (832) 359-2425
EVOTECH technician working inside a network cabinet
Fast EVOTECH reply

Start your EVOTECH request in under a minute.

1 minsimple request
Texaslocal and remote help
Inboxlead saved and emailed
Get a fast EVOTECH response Most requests only need name, phone, city, and service.
Choose a service and EVOTECH will guide the next step.
(832) 359-2425

EVOTECH uses your details only to reply, quote, schedule, or help with your requested service.

Cypress 77433 · Bridgeland · Towne Lake · Grand Parkway

Menu Board Media Player Installation for New Build-Outs in Cypress, TX 77433

West Cypress keeps adding restaurants: pad sites and new retail along the Grand Parkway and US-290, plus neighborhood centers serving Bridgeland, Towne Lake and Fairfield. While a suite is still bare studs, planning for the media players that will run your menu screens is simple, and correcting a poor plan after drywall and tile go up means opening finished walls. This page covers the choices and the build-out sequence we use so your menu is running and tested well before opening day.

Rough-in before drywallPlayer architecture planningSeparate signage networkPre-opening commissioning

Three decisions to settle while the walls are open

A menu board system on a new build comes down to three questions, and all three need answers before the drywall crew arrives:

  1. Which player architecture? A player inside each commercial screen, a separate player per screen, one box driving several screens, or a central head-end in the back office.
  2. Where will the player physically sit? Behind the screen, in the office, or inside a drive-thru enclosure. Each option changes what goes inside the wall.
  3. How does it reach the network? Which switch port, which network segment, and what it does before your internet service is live.

If your franchisor has already specified the hardware, the first question is answered for you, but the second and third still decide what we rough in. Your general contractor’s electrician handles the circuits; the low-voltage layout is a separate scope, and it is the one most often left until too late.

Four ways to feed a menu wall

ArchitectureHow it worksSuitsWatch for
Player built into a commercial screenThe display runs the content app itselfTidy walls with fewer parts to failScreen and player are one unit, so a failed panel takes the player with it; confirm your content vendor supports the platform
One external player per screenA small dedicated player on each displayMost franchise specs; simple one-for-one replacementScreens must be grouped for sync if artwork spans them
One multi-output playerA single box drives several screensMenus designed as one wide canvasEverything depends on one box, so plan a spare
Head-end in the back officePlayers sit on a shelf or rack; video travels to the screens over Cat6 extendersHot or hard-to-reach menu walls; easy servicingExtenders need power at both ends, and there is more cable to plan

Synchronization deserves its own note. If your menu includes animation that travels from one screen to the next, independent players gradually drift apart unless they are configured as a sync group on the same local network, or the content comes from a single multi-output source. Decide it now; adding sync after opening can mean replacing players.

Behind the panel or in the office: the trade-offs

A player mounted behind its screen keeps the HDMI run short, which is simple and dependable. The costs are heat, because it sits in warm air behind a panel that is lit all day, and access, because someone has to pop the screen out to reach it. If you choose this layout, specify pop-out mounts and a recessed box deep enough to hold the player’s power supply.

A back-office head-end puts every player on one shelf where it stays cool and easy to reach. Video travels to each screen over HDBaseT extenders on Cat6, which carry video (and, on many models, control signals) up to around 100 metres, or 328 feet, depending on the extender. That is ample for any restaurant suite. Passive HDMI is fine for a few metres; long passive runs hidden in a wall are the sort of thing that works on day one and turns into a flickering screen later.

One location to rule out: a sealed ceiling cavity above the service counter. Reaching it means ladders over a food-prep area, and it becomes a heat trap under the roof deck in a Texas summer.

Our rough-in checklist for each menu screen

  • A recessed power and low-voltage box behind each screen, positioned so the panel hides it completely in its final orientation.
  • Two Cat6 cables per screen location: one in use, one spare for a future player, sensor or camera.
  • Solid backing between the studs across the full width of the menu wall, placed from the mounting plan rather than guessed on the day.
  • A conduit or sleeve from the menu wall to an accessible ceiling, with a pull string, so cables can be added later without opening the wall.
  • For a head-end design, extender runs home-run to the office rack, each labelled at both ends.
  • For a drive-thru, a conduit path from the building to the board location, coordinated with the sign vendor and site contractor before paving.

We share the plan with the other trades in the suite (your POS installer, security camera contractor and sign company) so boxes, cables and backing do not collide. In a quick-service build, the menu wall is usually the most crowded wall in the building.

Putting the players on their own network segment

Menu players use very little bandwidth, but they need the network to behave predictably. On a new build we set that up from the start:

  • Separate from payments. Players go on their own virtual network, apart from the card terminals and POS. Keeping signage off the payment network also helps keep it out of your payment-card compliance scope.
  • Reserved addresses. Each player gets a fixed, documented address so support can find it.
  • Time and outbound access. Internet time servers reachable, and the outbound connections your content vendor requires allowed through the firewall.
  • Power over Ethernet where it fits. Some commercial players can run from a PoE switch port, which removes a power brick from behind the screen.
  • No guest Wi-Fi. Players never share the customer network.

One new-build problem we plan around all the time: the internet circuit is often one of the last services to arrive. We commission players on a temporary connection so content and schedules are proven before the permanent service lands, then move them across and test again.

Where our visits fall in the build-out schedule

  1. Plan review. We read the drawings and the franchisor’s signage spec, then walk the shell with your GC to mark screen and player locations.
  2. Rough-in. After framing, before insulation and drywall: backing, boxes, cable and conduit.
  3. Network closet. Rack or shelf, patch panel and switch space, set once the office walls are finished.
  4. Trim-out. After paint and wall finishes: mounts, screens and players.
  5. Commissioning. As soon as a working internet connection exists, temporary or permanent.
  6. Training. A walkthrough with the opening manager during soft opening or training week.

The tests we run before your doors open

  • Power-cut recovery. Kill power to the menu wall; every screen must return to the correct content without anyone touching it.
  • Daypart change. Move the schedule forward and confirm the breakfast-to-lunch switch happens on every screen at the same moment.
  • Publish test. Change a price in your content system and time how long it takes to appear on each screen.
  • Sync check. Watch any animation that crosses screens for drift over several loops.
  • Heat soak. Leave everything running for several hours, then measure temperatures at the players and behind the panels.
  • Remote control. Reboot a player from the content dashboard, and confirm the screens power down on schedule after close.

You receive a handover sheet listing each player’s name in the content system, its network address, hardware serial number, the screen it drives and where its cable terminates. Default passwords are changed, and the account belongs to you or your brand, not to us.

Quote factors and new-build mistakes to avoid

The quote is itemized. On a new build the main variables are the screen and player count, the architecture chosen, whether we supply the players or install brand-supplied hardware, extender runs to a back office, drive-thru conduit, and how many site visits the construction schedule demands.

The mistakes we are called to fix after opening are remarkably consistent:

  • No backing in the wall, so mounts end up in drywall anchors
  • Recessed boxes set for landscape when the menu turned out to be portrait, peeking out above the panels
  • Ethernet terminated at the counter instead of behind the screens
  • Players buried above a sealed ceiling
  • Players left on the guest network because the permanent internet arrived late and nobody moved them

Frequently asked questions

Our franchisor ships the players and screens. What is left for you to do?
Most of the work. Brand-supplied hardware still needs backing, boxes, cabling, mounting, network setup and commissioning. We install to the brand’s spec and flag anything in it that conflicts with your building.
The internet will not be installed until just before we open. Is that a problem?
Only if nobody plans for it. We commission on a temporary connection so schedules and content are proven early, then move the players to the permanent service and retest.
Can the menu players share a switch with the POS?
They can share hardware as long as they sit on a separate virtual network. What matters is that signage traffic and card-payment traffic are kept apart.
We might add a drive-thru board next year. Should we prepare now?
Yes. Laying conduit from the building to the board location before the lot is paved is far simpler than cutting through new paving later.

Book an on-site estimate for your Cypress build-out

Send the plans or your franchisor’s signage spec along with your target opening date. We walk the shell, mark the rough-in, and send an itemized quote. Licensed and insured, 5.0-star rated, and installing low-voltage systems around Houston for over two decades. Call (832) 359-2425.

Book a Consultation
EVOTECH technician working inside a network cabinet
Before you go

Ready for EVOTECH to help?

Before you leave, send the quick version. We will review the page you came from and reply with the clean next step.

1 minsimple request
Texaslocal and remote help
Inboxlead saved and emailed
Send the quick request No long questionnaire. A real EVOTECH lead comes straight to the inbox.
Choose a service and EVOTECH will guide the next step.
(832) 359-2425

EVOTECH uses your details only to reply, quote, schedule, or help with your requested service.

Need a fast quote? - Cypress
Call, message, or request your free estimate now.
Fast quote today • Same-day response available
Call Now: 832-359-2425 Chat on WhatsApp Book Appointment
Free Estimate Request
Thank you. EVOTECH received your request.
Fast quote • Call, WhatsApp, or send your request now
Free Estimate Available
Send your details now and EVOTECH will contact you quickly with pricing.
Thank you. EVOTECH received your request.
Call 832-359-2425