Serving Katy, Houston & surrounding areas • Licensed & Insured • 20+ Years (832) 359-2425
EVOTECH technician working inside a network cabinet
Fast EVOTECH reply

Start your EVOTECH request in under a minute.

1 minsimple request
Texaslocal and remote help
Inboxlead saved and emailed
Get a fast EVOTECH response Most requests only need name, phone, city, and service.
Choose a service and EVOTECH will guide the next step.
(832) 359-2425

EVOTECH uses your details only to reply, quote, schedule, or help with your requested service.

Katy new builds & drive-thru lanes — 77491

Menu Board Media Player Installation in Katy, TX 77491

Katy keeps adding restaurants: new pad sites and end-caps along the Grand Parkway, I-10 and the corridors pushing toward Fulshear and Brookshire. On a new build, whether the menu board player works on opening day is mostly decided months earlier, while the walls are still open. EVOTECH plans and installs the low-voltage side of counter and drive-thru menu boards so each player has power, network, cooling and service access exactly where it needs them.

Rough-in planningDrive-thru board playersGC & franchise coordinationOpening-week commissioningLicensed & insured

Why new Katy stores need the player planned at rough-in

77491 is a Katy mailing ZIP, so the businesses behind it are spread across the city, from established centers near Old Town and Mason Road to brand-new pads rising along the Grand Parkway. Most menu board player work we do in Katy is new construction or a full remodel, and that changes the job completely. Configuring the player is the easy part; the hard part is making sure the cable, blocking and boxes exist before the drywall closes.

A missed rough-in is expensive to correct afterwards: cutting finished drywall behind a counter, patching tile, or running surface raceway across a brand-new wall that the franchise’s opening inspection will flag. Getting it right costs a few hours of coordination at the right moment in the schedule.

The rough-in checklist for counter menu boards

  • Blocking in the wall. Wood or metal blocking behind every mount position, at the height on the brand’s elevation drawing. Menu boards usually hang as a row of three or four, so the blocking has to be continuous enough for the mount spacing.
  • A recessed box per screen. A recessed power and data box behind each display keeps plugs and cables inside the wall plane, letting a slim commercial panel sit tight to the wall.
  • Data drops. At least one Cat6 per player location, home-run to the network rack. We usually recommend a spare as well; it is trivial to add now and painful to add later.
  • Conduit and pull strings. A conduit from each box up to accessible ceiling space lets future HDMI, HDBaseT or extra data be pulled without opening the wall.
  • Player location decided. Behind the screen, inside the recessed box, or remote in the office with extenders. The choice changes box sizes and cable types, so it has to be settled now.
  • Circuit planning. Receptacles behind the screens are the electrician’s scope. We give exact locations so the outlets land inside the recessed boxes, and ask that the boards not share a circuit with kitchen equipment.
  • Plenum check. If the ceiling cavity returns air to the HVAC system, every cable run through it has to carry a plenum (CMP) rating. We confirm with the GC before ordering cable.

Who does what on a new-store menu board

PartyTypical responsibilityWhere coordination breaks
General contractorBlocking, wall finishes, overall scheduleBlocking set at an old height after the elevation drawing changed
ElectricianCircuits and receptacles behind screens and at the drive-thruReceptacle placed outside the recessed box, or tied to a kitchen circuit
Low-voltage contractor (EVOTECH)Data cabling, conduit pulls, player and display mounting, network hookup, commissioningBrought in after drywall, when cable paths are already closed
Brand or signage vendorPlayer hardware spec, CMS enrolment, menu contentPlayers shipped pre-enrolled to the wrong store ID
POS or IT vendorNetwork rack, firewall, point-of-saleSignage ports never assigned to the right VLAN before opening week

We ask for the brand’s signage specification at the start. Many franchise systems name the exact player model, mount and network layout, and our job is to meet that standard rather than improvise around it.

Drive-thru menu boards: players outdoors in a Katy summer

Outdoor drive-thru boards are a different class of installation. The display is a high-brightness sealed unit, and its player lives either inside the board’s enclosure or back in the building.

  • Heat. An enclosure facing west on a Katy afternoon heats quickly. Outdoor boards have cooling designed around specific internal loads, and adding an unapproved player inside can overwhelm it. We follow the enclosure maker’s guidance on what goes in the cabinet.
  • Underground conduit. Cable from the building to the board runs through buried conduit, which counts as a wet location, so the cable must be rated for outdoor wet use; indoor Cat6 pulled through a pipe will not last. Data cable also rides in its own conduit, separate from the power feeding the board.
  • Distance. Copper Ethernet tops out at 100 m (328 ft). Most lanes are well inside that, but a board at the far end of a wrap-around lane on a large pad can push it, and fiber with media converters becomes the answer.
  • Surge. A copper run out to a metal board standing in open ground is a path for lightning-induced surges back into the network rack. A grounded surge protector on the data line where it enters the building is inexpensive insurance.
  • Pre-sell and confirmation screens. Many lanes have a smaller screen before the main board and an order-confirmation display near the speaker. Each needs its own feed, and the confirmation screen typically ties into the POS rather than the signage CMS.

From rough-in to opening day: the sequence we follow

  1. Pre-construction review. We read the elevations and brand spec, mark box, blocking and conduit locations, and share them with the GC and electrician.
  2. Rough-in. Boxes, conduit, pull strings and Cat6 go in before insulation and drywall; drive-thru conduit is coordinated with the site contractor’s trenching.
  3. Open-wall photos. We photograph every wall with the cable locations visible, a record that helps anyone who works on the store later.
  4. Trim-out. After paint, we terminate and certify the cabling, hang mounts and displays, install players and dress the cables.
  5. Network hookup. Players are patched into the signage VLAN once the POS or IT vendor has the rack live.
  6. Commissioning. CMS enrolment to the correct store, schedule tests, power-loss and link-loss recovery, and the drive-thru board checked for readability from the speaker post.
  7. Opening-week check. We confirm the dayparts switch correctly on real trading days and fix whatever the soft opening exposed.

Problems that surface in a new store’s first week

  • Players enrolled to the wrong location. A pre-staged player from the brand shows another store’s pricing. We verify the enrolment ID before trim-out ends.
  • Network not ready. The POS vendor lights the rack days before opening and the signage ports were never assigned. We confirm VLAN and port assignments in writing well ahead.
  • Mixed orientation. Portrait boards hung with half the screens rotated one way and half the other, so bezels and logos disagree, and some models are not rated for the direction used.
  • Construction dust. Players installed before the final clean inhale drywall dust through their vents. We install after the dusty trades finish, or bag the units until they do.
  • Factory time zone. New players often arrive on a default zone and flip dayparts at the wrong hour on day one unless someone sets Central time.

Does a new store need a contractor for the players?

If the brand ships players pre-configured and the builder has already hung the displays on correct blocking with data behind them, a store manager can often plug in and pair. You need a contractor when the cabling and boxes do not exist yet, when the drive-thru is part of the job, or when the build schedule needs someone accountable for having the low-voltage side ready by a fixed opening date.

What affects the cost of menu board players in a new Katy build

  • Counter screens versus drive-thru boards; outdoor work with buried conduit is a larger scope.
  • Whether we join at rough-in or after drywall, since late involvement means surface work or repairs.
  • Player location strategy: behind the screen, recessed, or remote with extenders.
  • Distance from the network rack to the drive-thru, where fiber adds equipment.
  • Brand-specified hardware and mounts versus owner-selected equipment.
  • The number of site visits across the construction schedule.

Our quotes are itemized by phase, so the GC and owner can see what belongs to rough-in, trim-out and commissioning.

Frequently asked questions

When should we bring EVOTECH into a new build?
Before the walls close, ideally once elevations are final and framing is underway. That is when blocking, boxes and conduit cost the least. We can still work after drywall, but the options narrow to surface raceway or cutting finished walls.
Can the drive-thru board’s player sit inside the building?
Often, yes. An indoor player stays out of the enclosure heat, and the picture reaches the board over an extender or the board’s own network input, depending on the model. The board maker’s specification decides what is allowed.
Our franchise supplies the players. What do you do then?
We install them to the brand’s standard: cabling, mounting, network hookup and commissioning. We also confirm each player is enrolled to your store before opening, because a wrong enrolment is one of the most common new-store problems.
Do you work to our general contractor’s schedule?
Yes. We plan visits around rough-in, trim-out and the IT vendor’s rack date, and tell the GC in advance what must be in place for each visit.
Can Wi-Fi replace the data cable to the drive-thru board?
We do not recommend it. Outdoor wireless links can work, but a wired or fiber connection in conduit holds up better in heat and storms, and the site is already being trenched for the board’s power.

Opening a new restaurant in Katy?

Send us the elevations or the brand’s signage spec along with your construction schedule. We will mark what has to happen at rough-in and quote each phase separately. Book an on-site estimate or call (832) 359-2425.

Book a Consultation
EVOTECH technician working inside a network cabinet
Before you go

Ready for EVOTECH to help?

Before you leave, send the quick version. We will review the page you came from and reply with the clean next step.

1 minsimple request
Texaslocal and remote help
Inboxlead saved and emailed
Send the quick request No long questionnaire. A real EVOTECH lead comes straight to the inbox.
Choose a service and EVOTECH will guide the next step.
(832) 359-2425

EVOTECH uses your details only to reply, quote, schedule, or help with your requested service.

Need a fast quote? - Katy
Call, message, or request your free estimate now.
Fast quote today • Same-day response available
Call Now: 832-359-2425 Chat on WhatsApp Book Appointment
Free Estimate Request
Thank you. EVOTECH received your request.
Fast quote • Call, WhatsApp, or send your request now
Free Estimate Available
Send your details now and EVOTECH will contact you quickly with pricing.
Thank you. EVOTECH received your request.
Call 832-359-2425