West Katy is still being built, and a new building arrives with the worst schedule possible: none. During construction everybody shares one code, every credential opens everything, and the system sits in that state until somebody deliberately ends it. Occupancy day is the cutover — and it is much easier to design a schedule from zero than to untangle one a year later.
Every new 77494 building starts with the worst possible schedule: none
Cross Creek Ranch, Firethorne, Tamarron, Jordan Ranch, Cane Island and the commercial strips along the Grand Parkway, FM 1463 and Katy-Gaston are mostly newer than 2010, and much of it is still going up. Nearly every access system we commission out here has spent its first months in what installers call construction mode: one code shared by every trade, or a single round-the-clock credential level with every opening attached to it.
That is a reasonable way to finish a building and a terrible way to run one. The cutover has to be an event somebody owns, on a date, or it never happens. We have walked into two-year-old suites in this ZIP where the framing crew’s code still opened the back door.
The cutover is four things: retire every construction credential, stand up real roles, put hours behind them, and write down what you did. Skip the fourth and the next person will start over.
Step one – list every opening and what kind of lock is actually on it
Before hours mean anything, you need to know what each door physically does when told to unlock, because the answer is not the same on every leaf.
- Fail-safe or fail-secure. A magnetic lock releases when power is removed. An electric strike is specified one way or the other. “Unlock” on a schedule produces different behaviour, and different consequences during a power failure, depending on which you have.
- Sensors present. A door position contact and a request-to-exit device are what let the system report a real event instead of guessing. A schedule without door contacts cannot tell you a door was propped.
- Egress path. Openings on the way out keep mechanical free egress, with no power and no software involved. That is hardware and code, decided with the authority having jurisdiction, and it is never adjusted by programming.
- Circuit. Note which openings are on backup power, because it determines what the building looks like ten minutes into an outage.
In a new building this list should come from the installing contractor. In practice we usually build it by walking the doors.
Step two – name the roles before you touch a clock
The most expensive mistake in a new system is naming access levels after people. Six months later you have a level called Sarah, Sarah has left, and her level is attached to nine credentials nobody dares delete.
Name them after the job and the hours instead, and let every credential inherit one:
- Staff – business hours
- Staff – extended, for the two people who open and close
- Management – unrestricted
- Cleaning – Tuesday and Thursday nights
- Contractor – expiring, reused for every trade that comes through
Five roles will cover most new suites in this ZIP. If your draft has more than about eight, the design has probably absorbed individual exceptions that belong in a person’s record, not in the structure.
Step three – draw the week on paper, in the panel’s own units
Sketch seven rows, one per day, and block out when each role should get in. Then translate — and translation is where designs break, because a controller is a finite device.
- Interval count. Schedules hold a limited number of intervals. A design with a different window every day of the week can exceed that limit, and you find out at download time.
- Schedule count. Panels cap how many schedules and levels they can store. Check the number before drawing eleven of them.
- Resolution. Most current hardware works to the minute; some older controllers round. Do not design around a 7:52 start.
Decide, per door, whether it is credential-only or gets an automatic unlock. A lobby or waiting area is a fair candidate for a timed unlock, and it should wait for the first valid badge of the day before releasing, so an empty morning leaves the door shut. A stock room, a server closet or anywhere with records stays credential-only at every hour of the week.
Step four – load next year’s closure dates before you need them
Commissioning is the cheapest moment this will ever be. Load the full coming year: the fixed dates, the ones that move, the Friday after Thanksgiving, and the winter week if the business takes it.
Then make one decision per role, because a closure date is not neutral. With no interval defined for that date, a schedule is inactive and the role is locked out — correct for general staff, wrong for the person on call and for the cleaning crew who come anyway. Those roles get their own level whose schedule stays live through closures.
If your building is a multi-tenant office or medical condo of the kind going up along the Grand Parkway, check your closures against the landlord’s. A tenant closed on a day the building treats as ordinary is harmless; a tenant expecting entry on a day the building has shut down its common areas is a support call.
Step five – prove it on the edges, then write down what you built
A schedule tested at two on a Wednesday afternoon has been tested at the one moment that cannot fail. Testing means standing at the reader with a real credential from each role at the minute a window opens and the minute it closes, with the event log visible, and confirming the log records the decision you intended rather than merely that the door opened.
Two checks people skip: watch the relock actually fire at the end of an unlock window, and try one credential on a day it should be refused. A schedule that never denies anybody has not been proven to do anything.
Then the commissioning record, which for a new system is short and permanent: the opening list with lock types, the roles and their hours, the closure dates loaded, the credentials issued and their expiry dates, confirmation that construction access was purged and on what date, and where the controller and power supply live. Two named administrators, separate logins.
Long drives, front gates, and a second clock nobody syncs
West of the Grand Parkway, towards Fulshear, lots get larger and gated drives become common, and the gate operator is its own small computer with its own clock and its own timer settings. It drifts independently of everything else on the property, which is why a gate can start opening at the wrong hour months after anyone touched it.
The schedule people ask for is a hold-open window for deliveries, and it is the one most often regretted. A gate standing open is a gate whose safety edges and photo eyes are doing nothing, on a drive where the house is not visible from the road. A temporary code with a start and end date, or an intercom that reaches a phone wherever the owner is, solves the delivery problem without leaving the property open to the street for three hours.
Whatever is programmed, the gate’s mechanical safety requirements are unchanged by any of it, and the entry and exit loops still have to work correctly before timing is worth discussing.
The point where the builder’s app stops being enough
A smart lock with a phone app is fine for a single household or one office door. It genuinely handles a cleaner who comes Thursdays. Call a contractor when:
- You have more than about three openings, or two that must behave as a set.
- Access must expire on its own, without anyone remembering.
- A gate operator, an alarm partition or a camera system has to agree with the door schedule.
- You need a defensible record of who went where — for an insurer, a client contract or a licence condition.
- The building is occupying in phases and access has to change every few weeks.
- Nobody can say what the construction credentials were or whether they still work.
What we look at before quoting a new-system schedule build
Nothing is priced before a look, and the estimate itemizes what we found. The scope moves on:
- How many openings, and whether the low-voltage rough-in reached every one of them.
- Whether the controller is new, inherited from the builder, or still needs to be selected.
- How many roles the operation genuinely needs once the exceptions are stripped out.
- Whether a construction-credential purge and full re-issue is part of the work.
- Whether occupancy is phased, which means more than one visit by design.
- Whether a gate operator, alarm or camera system has to be brought into agreement.
EVOTECH IT LLC is a licensed and insured low-voltage contractor serving Katy, Fulshear, Richmond, Houston, Sugar Land and Cypress, with over twenty years of field work behind it. The on-site estimate costs nothing.
Related services
Frequently asked questions
The builder gave everyone the same door code. When should that change?
On the day you take occupancy, before the furniture. A shared construction code is known to every trade that worked the site and to anyone they told, and it does not become safer with age. The cutover is short: issue real credentials against defined roles, delete the construction code and any generic credential, put the hours in, and record the date it was purged so there is no doubt later.
We are moving into a new suite in phases. Can the schedule follow the phases?
It should, and phased occupancy is normal in the newer buildings going up around the Grand Parkway. Build the final design once, then activate it in stages: the roles that exist on day one get their hours immediately, openings still under punch-list stay credential-only with a short list of people, and contractor credentials carry expiry dates matching their phase. That way the last phase is a small change rather than a rebuild.
Can the front gate at the end of my drive be on a schedule?
Yes, though a gate operator keeps its own clock and its own timers separate from any door system, so it has to be set and checked on its own. We would steer you away from long hold-open windows on a rural-feeling drive — an open gate leaves the property readable from the road with its safety devices idle. Expiring codes for a delivery window, or an intercom that reaches your phone, usually does the job better.
Our smart lock app already does schedules. Why would we need a panel?
For one or two doors and one household, you may not, and we will say so. What app-based locks do poorly is scale and evidence: shared groups across several openings, credentials that expire on their own, a record you can hand an insurer, and any interlock with a gate or alarm. If you are running a suite, an amenity building or anything with staff turnover, the structure of roles and schedules is what you are really buying.
How long does a first-time schedule build take?
Less time than people expect, and most of it is not spent at the keyboard. Walking the openings, agreeing the roles and drawing the week takes the bulk of it; entering the configuration is quick. Boundary testing adds time because some of it has to happen at the hours being tested. A small new suite is usually a single visit; a phased occupancy or a building with a gate is planned as more than one from the start.
What happens to the schedule when the internet goes out?
It depends on the hardware, and it is worth knowing before it happens. Controllers that keep their configuration locally continue to enforce schedules with no connection at all, and upload their event log once the link returns. Devices that check a cloud service for every decision fall back to a default behaviour instead. We confirm which type you have during commissioning and record it, so an outage is a known quantity rather than a surprise.
Book a free commissioning walk in Katy 77494
Tell us the building or suite, how many openings were roughed in, and whether you are occupying all at once or in phases. We will design the roles and hours, purge the construction access, prove it on the boundaries and leave you the record. Call (832) 359-2425.
Book a Free Consultation
Ready for EVOTECH to help?
Before you leave, send the quick version. We will review the page you came from and reply with the clean next step.